Software and automation for plastics and rubber manufacturers

Presses and extruders run around the clock, but scrap, downtime and changeovers are still logged on clipboards. NuruState builds software that captures what happens on the floor and turns it into decisions.

Operator adjusting a production machine during setup

Where manual work piles up

Scrap and downtime recorded too late

Counts, scrap and stop reasons are written down at the end of the shift, so the numbers arrive after the chance to act has passed.

Mold and tool changeovers

Tool changes, color changes and material purges take press time, and the sequence of jobs decides how much.

Resin lots and customer certifications

Material certs, lot records and inspection data have to be matched to each shipment for customers who audit their suppliers.

Quoting custom parts

Every RFQ means pulling cycle times, material costs and past quotes together by hand.

Common requirements

Requirements usually come from customers and certifications rather than one regulation: ISO 9001 quality systems, IATF 16949 and PPAP for automotive suppliers, and FDA food-contact rules (21 CFR Parts 174 to 178) for resins and parts that touch food.

Sources

NuruState does not provide legal or regulatory advice. You remain responsible for compliance in your facility; we work within the procedures your quality team already owns.

Who we work with

  • Injection molders
  • Extruders and film producers
  • Rubber and silicone molders
  • Compounders

Questions from plastics and rubber manufacturers

What does NuruState build for plastics and rubber manufacturers?

Custom software, integrations and AI automation for the manual work around production. For plastics and rubber manufacturers, that usually starts with production reporting and OEE, downtime logging and changeover optimization. The assessment ranks the opportunities in your plant, and anything not listed can be built too.

Do we have to replace our ERP or other systems?

No. Workflows integrate with your existing systems. The assessment tells you what is ready now and what needs infrastructure first.

How does a project start?

With a free 30-minute discovery call. If it fits, the $7,500 assessment maps the opportunities in your plant, with the baseline and estimated value for each, and the highest-value workflow is then proven in a 90-day pilot.

Tell us the job nobody wants to do.

Start with a free 30-minute call. If it fits, the $7,500 assessment maps the opportunities in your plant, with the baseline and estimated value for each.