Predictive maintenance
Failure patterns flagged early from the signals your equipment already produces, with the work order drafted for maintenance to approve.
- Department
- Maintenance & engineering
- Who it helps
- Maintenance teams and plant managers dealing with unplanned breakdowns
- What we measure
- Unplanned downtime hours per week, against your baseline
An illustrative design of how we build this workflow. Every build is scoped to your plant, your systems and your rules during the assessment.

The problem
Breakdowns arrive without warning and turn into night and weekend repairs, rush parts and a line standing still. Maintenance spends the week reacting instead of planning.
How it works today, and with NuruState
Today
- Equipment fails during production
- Line stops while maintenance diagnoses the fault
- Parts rushed in or pulled from another line
- Repair done at overtime or call-out rates
- Work order written up after the fact
With NuruState
- Vibration, temperature, current and pressure read from PLCs and the historian
- Patterns that came before past failures on this asset flagged early
- Work order drafted in the CMMS with the evidence, likely failure mode, suggested window and parts
- ApprovalA planner or supervisor confirms, reschedules or dismisses the alert
- Repair done in a planned stop, and the outcome logged against the baseline
What we build
The screens, automations and connections, scoped to your plant. You use them in the tools your team already works in wherever possible.
- Connections to your PLCs and historian
- A model trained on your own asset and failure history
- Alert thresholds per asset class, set with maintenance
- Draft work orders in your CMMS with the evidence attached
- A view of open alerts, decisions and outcomes
Where people stay in control
The workflow prepares and carries out the repetitive work. Decisions that affect product, people, customers or money stay with your team, under rules agreed before go-live.
Your team decides
- Whether and when to intervene on an asset
- Which alerts are dismissed as false
- Alert thresholds for each asset class
- When the model is retrained
The workflow handles
- Watching sensor data around the clock
- Matching trends against failure history
- Drafting work orders with the evidence attached
- Texting the maintenance team before a likely failure
Systems it connects to
Typical systems for this workflow, not certified integrations. Which connections your plant needs, and what access they get, is confirmed in discovery and the assessment.
What we measure
We measure your baseline first, then agree the success metric in writing before a pilot starts. Results come from your own system data, reported weekly. If the agreed metric is not hit at 90 days, you get a full refund.
- Unplanned downtime hours per week
- Breakdowns preceded by an alert and a planned repair
- Alerts confirmed versus dismissed
- Emergency repair and call-out costs
No promised percentages: the target depends on your baseline and is set with you.
Limits worth knowing
What this workflow will not do, so expectations are clear before a pilot.
- Assets without sensor data, or with less than about six months of history, cannot be modeled yet. The assessment shows which assets qualify.
- Failure modes that have never occurred on your equipment are hard to predict, because the model learns from your history.
- Alerts are probabilities, not certainties. Some will be false positives, which is why a person confirms each work order.
- It adds an early warning on top of preventive maintenance and OEM schedules. It does not replace them.
Questions about predictive maintenance
What is predictive maintenance?
Predictive maintenance is the practice of using equipment data, such as vibration, temperature, current and pressure, to spot the patterns that come before a failure, so the repair happens in a planned stop instead of a breakdown. In this workflow, each alert becomes a drafted CMMS work order that a planner or supervisor approves.
Do we need new sensors?
Often not. Many lines already log vibration, temperature, current or pressure through PLCs and a historian. The assessment checks coverage asset by asset and flags where a sensor would be needed before a pilot.
Which CMMS can it work with?
It drafts work orders in the CMMS you already use. Maximo, Fiix and MP2 are typical examples; the exact connection for your system is confirmed during the assessment.
How is success measured?
Against a baseline we measure with you before the pilot, for example unplanned downtime hours per week. The success metric itself is agreed in writing for your plant before work starts, and if it is not met at 90 days you get a full refund.
What happens when the model is wrong?
A person reviews every alert before work is scheduled. Dismissed alerts are recorded, so thresholds can be tuned with your maintenance team.
Related workflows
Find out if predictive maintenance fits your plant
Start with a free 30-minute call. If it fits, the $7,500 assessment maps this workflow and the other opportunities in your operation, with the baseline and estimated value for each.
