Production scheduling

When a line goes down, material is late or an order changes, planners get a re-optimized schedule to review, with the reasoning shown.

Who it helps
Production planners and supervisors re-planning around disruptions
What we measure
Planner time per re-plan, against your baseline

An illustrative design of how we build this workflow. Every build is scoped to your plant, your systems and your rules during the assessment.

Wide view of a beverage plant with conveyors and packing lines

The problem

A breakdown, a late material or a rush order breaks the plan, and a planner spends hours rebuilding it by hand. By the time the new schedule is ready, something else has changed.

How it works today, and with NuruState

Today

  1. Disruption reported by phone, email or in person
  2. Planner pulls orders, inventory and line status
  3. Schedule rebuilt in a spreadsheet
  4. New plan shared with supervisors
  5. Changeovers and due dates checked after the fact

With NuruState

  1. A breakdown, shortage or order change picked up from your ERP or MES
  2. Changeover matrices, material availability, line rates and due dates weighed together
  3. A revised schedule proposed, with the reasoning behind each change
  4. ApprovalPlanners and supervisors accept, adjust or reject the plan
  5. Re-planning time and missed due dates tracked against the baseline

What we build

The screens, automations and connections, scoped to your plant. You use them in the tools your team already works in wherever possible.

  • Connections to the scheduling data in your ERP or MES
  • A constraint model of your lines, rates and changeovers
  • A re-planning screen with the proposed plan and its reasons
  • Notifications to supervisors once a plan is approved
  • Plan-versus-actual tracking

Where people stay in control

The workflow prepares and carries out the repetitive work. Decisions that affect product, people, customers or money stay with your team, under rules agreed before go-live.

Your team decides

  • The final schedule
  • Customer priorities and trade-offs
  • Constraints and planning rules
  • Communicating changes to the floor

The workflow handles

  • Watching for disruptions
  • Re-optimizing the schedule
  • Explaining the proposed plan
  • Learning from what happened

Systems it connects to

Typical systems for this workflow, not certified integrations. Which connections your plant needs, and what access they get, is confirmed in discovery and the assessment.

  • ERP or MES with scheduling data (SAP, Oracle, Plex or similar)
  • Documented constraints: line rates and a changeover matrix
  • Inventory and purchasing data for material availability

What we measure

We measure your baseline first, then agree the success metric in writing before a pilot starts. Results come from your own system data, reported weekly. If the agreed metric is not hit at 90 days, you get a full refund.

  • Planner time per re-plan
  • Orders shipped on time
  • Changeover time lost to unplanned sequence changes
  • Schedule changes per week

No promised percentages: the target depends on your baseline and is set with you.

Limits worth knowing

What this workflow will not do, so expectations are clear before a pilot.

  • It needs an ERP or MES with scheduling data, and documented constraints such as line rates and a changeover matrix.
  • It is worth it only where the schedule changes often, usually daily.
  • A plan is only as good as the constraints it is given.
  • The success metric is agreed during the assessment, because scheduling gains differ widely between plants.

Questions about production scheduling

What is production scheduling?

Production scheduling is deciding what runs on which line, and when, so orders ship on time with the materials and capacity you have. This workflow re-plans when a line goes down, material is late or an order changes, weighing changeovers, materials, line rates and due dates, and shows its reasoning for planners to approve.

Does it replace our planner?

No. It does the re-calculation. Your planners decide which plan runs.

Which ERP or MES does it work with?

Systems with scheduling data, such as SAP, Oracle or Plex, are typical examples. The assessment confirms the connection for yours.

How is success measured?

Against a baseline we measure with you before the pilot, for example planner time per re-plan or on-time completion. The success metric itself is agreed in writing for your plant before work starts, and if it is not met at 90 days you get a full refund.

How is it different from changeover optimization?

Production scheduling re-plans the whole schedule when a disruption happens. Changeover optimization learns the fastest product sequences for the daily run order. Some plants start with one and add the other.

Find out if production scheduling fits your plant

Start with a free 30-minute call. If it fits, the $7,500 assessment maps this workflow and the other opportunities in your operation, with the baseline and estimated value for each.